Clark Township Fire Department ( Garage Roof Replacement )
We were hired by the township to replace the leaky garage roof. We first removed all the old existing skylights. Framed out the skylight openings and covered with new plywood. Removed the existing layers of roofing and wet insulation down to the wood deck. Installed a layer of 1.5" Polyisocyanurate foam core roof insulation (R-value 9.0). Installed tapered insulation to form drainage crickets between the drains. Over the insulation we installed a new 060 fully adhered EPDM rubber membrane roof system complete. In the end the township received a more thermally efficient roof system, that comes with a 15 year warranty. And probably the most important thing to them a dry building.. |
 |
 |
 |
 |
 |
 |
 |
Scotch Plains contemporary residence with flat/low slope roofs.
Customer had active leaks. After removing a layer of timberline shingles and a layer of torch down we repaired wood damage and installed a layer of 1 ˝” Polyisocyanurate roof insulation (R-value 9.0), then installed an 80 mil PVC Membrane roof system, fully adhered. The combination of the insulation and white membrane will result in substantial energy savings to the homeowner – as well as being environmentally friendly. |
 |
 |
 |
 |
 |
 |
 |
 |
 |  |
Majestic Bowling Alley, Woodbridge, NJ – Energy Efficient Installation
We were called in to stop leaks at several locations and upon inspection recommended a new roof system. At the owner’s request of an aesthetically pleasing and energy efficient roof, we installed a Carlisle 060 TPO Membrane Roof System. |
 |
 |
 |
 |
 |
 |
 |
 |
Carteret Middle School
Carteret, NJ -
Roof repairs -
We stripped in seams on the existing roof system over a 20' x 20' area.
We then applied two coats of Tremco Fluid Applied Acrylic Coating . |
 |
 |
 |
 |
 |
|
|
|
Donato Florist
Roselle Park, NJ - Replaced Front Mansard Roof -
Removed existing asphalt shingle roof. Installed a new una-clad standing seam metal roof.
|
 |
 |
 |
 |
Jersey Ice Corp
Elizabeth, NJ -
Roof Replacement -
We removed the existing roof & installed a new Carlisle EPDM membrane roof system.
The challenge on this project was to lift the large chillers and build new curb supports all while not disconnecting units and allowing the customer to remain open. |
 |
 |
 |
 |
 |
 |
|
|
Pool Cabana
Colts Neck, NJ -
Installed a new cedar shake shingle roof system complete with all new copper work.
Approximately 1600 Sq. Ft |
 |
 |
 |
 |
Strip Mall
Woodbridge, NJ -
Repairs as needed with new solar panel system |
 |
 |
|
|
Strip Mall
Iselin, NJ - Installed a new Carlisle 060 TPO Membrane roof over original 25 year old EPDM roof. This roof came with a 15 Yr. warranty. |
 |
 |
 |
 |
 |
|
|
|
Valencia Restaurant
Elizabeth NJ -
New Roof on Addition -
Installed new tapered insulation and a new fully adhered EPDM Roof complete.
At the end, provided a 20 Yr Warranty |
 |
 |
 |
 |
Berry Plastics Corp
Elizabeth, NJ - New Roof on Addition - Installed a new Carlisle 045 TPO Membrane Roof System over 20 Yr. EPDM. The TPO roof was a nice lightweight, affordable solution and came with a 15 year warranty. |
 |
 |
 |
 |
 |
 |
|
|